Crushing Plant

 

New line has been involved installing a new crushing plant in Welshpool for one of our customers.

This included a 180kw cone crusher, vibrating screen, magnet belts and various conveyors to transport the product around the plant.

This install was completed to a mine site specification.

IMG_2271.JPG
IMG_2272.JPG
IMG_2276.JPG
IMG_2274.JPG

Induction Heating Plant Project

 

This project has been a very interesting project, this project involved a whole new upgrade of the incoming HV supply and switch gear so two new inverters could replace an existing inverter unit.

One 3khz inverter 2400KVA and one 1khz inverter 3400KVA.

Replacement of the LV electrical equipment and changing the hydraulic system to electrical.

IMG_2228.JPG
IMG_2244.JPG
IMG_2269.JPG
IMG_2313.JPG
IMG_2346.JPG
IMG_2356.JPG
IMG_2345.JPG
IMG_2355.JPG

Fan Exhaust control panel

We were asked to come up with a panel to shut off 4 x extract fans after an hour of running after the workers have left the building. This was to make sure the fumes in the spray booths had cleared completely. The pictures below show the panel we cam up with and installed.

IMG_20150819_124514.jpg
IMG_20150819_124524.jpg
IMG_0382.jpg
IMG_0383.jpg
IMG_0387.jpg
IMG_0389.jpg

Main Disboard Upgrade

 

Removal of the existing old style disboard from a customer in Maddington, this board in the pictures is for the offices and the lunch room area plus aircons. This is a small part of a larger upgrade of the electrics in this building.

We had to complete this after hours and worked through the evening to complete the job. 

IMG_0390.jpg
IMG_0392.jpg
IMG_0395.jpg